Bespoke Pergola built to the spec of the client (3m x 3m) #bury #hollins


So the task requested by the customer was to fit a door matching the style of the cupboard to the right fitted years ago.
They already had 2 shelves fitted different depths from the wall. We fitted more shelves at the bottom after removing a set of draws and replaced the tired double socket.
Next was to build a frame and fit the doors and handles.
The Louvre doors purchased came with no finish and one had to be adapted to fit, once adapted were painted twice before off site with a final coat on site.



The small jobs no body wants are just as important as the big ones. Tasked to get rid of old, warped, creaking, uneven floor boards in a section of the landing in the #Elton #bury area. Theoddjob

Skirtings removed. Then the new laminate flooring was installed and all skirting re-fitted ready for the client to sand and paint. All fitted in a conservatory based in the #elton area, #bury Theoddjob


